
Looking for a reliable ATC Tool setting gauge? We stock this part for PCB drilling and routing machines as part of our Other Spare Parts range. Every unit is checked before dispatch and shipped from Shenzhen, so downtime on your drilling or routing line stays short.
What the ATC Tool setting gauge Does
This spare part keeps a PCB drilling or routing machine running at its original accuracy and uptime.
Product Details
Taliang Tool Diameter Measuring ,contact-type tool measureing
Ordering & Delivery
- Trade Ter
- Trade Term: FOB Shenzhen USD by T/T in advance.
- Discount is allowed against your quantity.
- OED/OEM is accepted.
- Delivery will be carried out by Express or your requirement.
- Lead Time: 2~7 days after payment.
Frequently Asked Questions
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: If machines, it will be about 10~15 working days. If spares, it will be about 2~3 working days after payment.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
When to Replace It
- Alarms related to this assembly
- Visible wear or damage
- Loss of accuracy or repeatability
How to Confirm Compatibility
Before ordering, please check or send us:
- Machine brand and model
- Original part number
- Photos of the installed part
Looking for complete machines? See our Drilling & Via Formation and Profiling & Routing.
Technical Questions
Do you supply other spare parts for the same machine?
How fast can the ATC Tool setting gauge be delivered?
What information do you need to quote the ATC Tool setting gauge?
When should the ATC Tool setting gauge be replaced?
Sources & References
- IPC-A-600: Acceptability of Printed Boards
- IPC-6012: Qualification and Performance Specification for Rigid Printed Boards
- Photo Chemical Machining Institute — process capability guidelines
- NIST Engineering Statistics Handbook — process tolerance and capability
Standards are referenced for context. Always confirm parameters against the current published edition and your own process validation.








